Mixture Application; Mixing Using Master Battery Priority; Mixture Using Battery Deployment Option - Pylontech UP5000 Product Presentation

Hide thumbs Also See for UP5000:
Table of Contents

Advertisement

Mixture application

A new battery module can be added onto an existing system at any time. Please make
sure that the new battery is acting as the master. The new module, due to a higher SOH
may have a difference on SOC with the existing system, but it will not affect the parallel
connection system performance.

*Mixing using master battery priority:

US3000C > US2000C > US3000 >US2000
*For same type of module always use the latest product unit as master

*Mixture using battery deployment option:

Master battery (1
Slave 2
~ 8
nd
th
Slave 9
~ 16
th
th
Page 38
)
US3000C > US2000C
st
US3000C/US2000C/US3000/US2000
US3000C/US2000C
Contact SegenSolar (PTY) Ltd | e: info@segensolar.co.za | t: 08780 20663

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Us2000cUs3000c

Table of Contents