12.1.1.2 OTC
6. Power up the Ceiling suspended unit and check all
7. Move the Ceiling suspended unit around and observe
12.1.1.3 Table
8. Move the Table in X, Y and Z direction an make sure it
9. Move the Table top in longitudinal direction and check
12.1.1.4 Wallstand
10. Move the Wallstand up and down in Z direction and make
Operator´s Manual
2020-09-14
functions.
any irregularities.
runs smoothly and without any dissonance.
that the mechanical end stops are not loose.
sure it runs smoothly and sounds OK.
1000-095-071-EN Rev. 1.1
Page 175
Appendix B
Monthly Checklist
OMNERA®