Installation; Trolley; Adjusting The Gauge - HADEF 19/90 Installation, Operating And Maintenance Instructions

Monorail trolley, push travel trolley, hand geared trolley, electric trolley
Table of Contents

Advertisement

bolt
Type
Size
7,5 t
N1
69
19/90
N2
71
N1
71
22/90*
N2
73
N1
81
22/90 E
N2
82
*without hand chain
Pos : 9.3 /1_H AD EF/5--TECHNISCHE DAT EN/Allgemei n/E-Motor/400V Motor @ 3\mod_1378727800377_52.doc x @ 27382 @ @ 1
3-phase current motor 400V/50Hz - IP55 – F – max. 1000 m above sea level.
Order-related Special data, refer to the motor nameplate.
Pos : 10.1 /1_H ADEF /6--MONT AGE/*Ü1* /#. Kapitel - Montage @ 0\mod_1172127582099_52.doc x @ 255 @ @ 1
6

Installation

Pos : 10.2.1 /1_H ADEF /6--MONT AGE/Allgemei n/01.All e H ebez eug e @ 0 \mod_1182334877463_52.doc x @ 6265 @ @ 1
The assembly and installation depends on the local environment. The hoist must be suspended in a way that
it can position itself freely.
Pos : 10.2.2 /1_H ADEF /6--MONT AGE/Allgemei n/02.auf Träger - allgemein @ 0\mod_1172220892763_52.doc x @ 270 @ @ 1
6.1

Trolley

For assembly on a beam a travel limit must be placed at either end of the track.
This must be attached so that any elastic limitation buffer or the trolley wheels are driven against them in
their end position when moving.
Generally, additional lifting gear (e.g. fork lift, lifting platforms) will be required for the assembly. These must
take the weight of the devices securely.
Pos : 10.3.1 /1_H ADEF /6--MONT AGE/F ahrwer ke 18/16VA+19/90 bis 28/ - 29/... - 209/05/19/90 bis 28/ - 209/05/1.1.Spur weite einstellen - F ahr w.+H-Z üge @ 0\mod_1182780256011_52.doc x @ 6575 @ @ 1
6.2

Adjusting the gauge

The trolley can be adjusted to various beam flange widths. Adjustment to the relevant beam flange width "B"
depends on the type and size and is to be made as follows:
 There are distance tubes (5) and/or washers
(6) situated on the load bars (2) of the trolley.
 Dimension "X" is set by placing washers (6)
from the outer to the inner side ("X" increases)
or from the inner to the outer side ("X"
decreases).
 Washers (6) and rubber discs (depended on
type) leave a distance for the load hook. It is
important that the load hangs in the middle
under the beam so that the two side plates are
equally loaded.
 The suspension eye (9) (if existent) for bigger
load bolts must still be swivelling after it has
been secured.
 Tighten the hexagon nut (3) and safety nuts (4)
again.
 Check correct flange width "B" and dimension
"X". Adjustment must be repeated if necessary.
Pos : 10.3.2 /1_H ADEF /6--MONT AGE/F ahrwer ke 18/16VA+19/90 bis 28/ - 29/... - 209/05/19/90 bis 28/ - 209/05/2.Montage auf Tr äger - Fahr w.+ H-Z üge @ 0\mod_1182781260523_52.doc x @ 6580 @ @ 1
8
10 t
12,5 t
16 t
88
-
-
91
-
-
92
220
200
95
-
-
103
204
291
107
-
-
20 t
25 t
32 t
-
-
-
-
430
500
630
-
-
403
-
-
-
1 side plates
2 load bars
3 hexagon nut
4 safety nuts
5 distance tubes
6 washers
7 ---
8 rubber disc (depended on type)
9 suspension eye
40 t
50 t
-
-
-
-
-
-
820
1010
-
-
-
-
-
-
-
-
-
5.52.653.00.01.05

Advertisement

Table of Contents
loading

This manual is also suitable for:

22/9022/90 e

Table of Contents