If the meter has no communication unit, this is replaced by a dummy case.
An additional component, which is easy to install, allows the use of a
standard padlock instead of a utility seal.
Figure 23. Front door sealing using a padlock
The seal component is stowed away in a holder under the front door when
not in use.
Figure 24. Stowage of seal component when not in use
The seal component is installed as follows:
Slide the seal component into the vertical slot at an angle, as shown,
(position 1) until it contacts the rear wall.
Now turn the seal component until it is horizontal and slide it down into
position 2 as illustrated. The two bulges firmly fix the seal component
into the lateral grooves.
D000030108 en m – E650 Series 3 – ZMD300AT/CT – User Manual
Mechanical construction

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zmd300 t seriesZmd300atZmd300ct

Table of Contents

Save PDF