Standard Set-up Procedures
4
4.1
Standard Set-up Procedures
Pre-Poured Inverts
The pre-poured invert must be set at the correct elevation and on the correct
line position.
•
Set the grade. Enter the required grade
for the pipe to be laid in the display of the
Piper.
•
Set the elevation. Set the elevation by
attaching the required size feet to the
Piper. The Piper comes standard with 150
mm (6 inch) feet, and offers optional feet
for 200, 225, 250 and 300 mm (8, 9, 10,
and 12 inch) pipe.
•
Set the line. Place the Piper in the invert
and adjust the beam so it is in-line with
the next manhole.
44