Transport; Installation - horsch Taro 6 HD Operating Instructions Manual

Table of Contents

Advertisement

3 | Commissioning
24

3.2 Transport

Depending on country specific regulations and working width the equipment can be
transported on public roads, either attached to a tractor or on a trailer or low
loader.
1. The permissible dimensions and weights for transport must be complied with.
2. Choose the tractor large enough, to ensure sufficient steering and braking
capabilities.
3. For machine with 2-point connection, block the tractor link arms against
swinging sideways.
4. Secure the machine on a trailer or low loader with suitable securing means
(e.g. Load straps or chains).
5. Attach lifting tackle only at the marked points.

3.3 Installation

Instruction of the operator and initial installation of the machine will be carried out
by our service engineers or distributors.
Any preceding use of the machine is prohibited!
The machine can only be released for operation after the instruction session conduc-
ted by service technicians or sales partners and after the operating instructions have
been read.
WARNING
Increased danger of accidents during commissioning.
Ø Observe the notes in the Safety chapter and familiarise yourself with the ma-
chine!
1. Take loosely delivered parts off the machine.
2. Remove all parts from the hoppers.
3. Check all important screw connections.
4. Lubricate all lubrication points.
5. Check the air pressure in all tyres and correct it if necessary.
6. Check all hydraulic connections and hoses for correct fastening and function.
7. Immediately rectify any occurring damage or have it corrected.
NOTE
Refer to the pertaining operating instructions regarding the installation of the drill
controls.
60029922 • 1 • 09/2020 • en

Advertisement

Table of Contents
loading

Table of Contents