Connecting Enervista Sr3 Setup To The Relay; Configuring Serial Communications - GE Multilin 350 Series Instruction Manual

Feeder protection system
Hide thumbs Also See for Multilin 350 Series:
Table of Contents

Advertisement

SOFTWARE SETUP

3.2.3 Connecting EnerVista SR3 Setup to the relay

3.2.3.1 Configuring serial communications

3–14
Courtesy of NationalSwitchgear.com
Before starting, verify that the cable is properly connected to either the USB port on the
front panel of the device (for USB communications) or to the RS485 terminals on the back
of the device (for RS485 communications). This example demonstrates an USB connection.
For RS485 communications, the GE Multilin F485 converter will be required. Refer to the
F485 manual for additional details. To configure the relay for Ethernet communications,
see Configuring Ethernet Communications below.
1.
Install and start the latest version of the EnerVista SR3 Setup software (available from
the GE EnerVista CD). See the previous section for the installation procedure.
2.
Click on the Device Setup button to open the Device Setup window and click the Add
Site button to define a new site.
3.
Enter the desired site name in the "Site Name" field. If desired, a short description of
the site can also be entered. In this example, we will use "Substation 1" as the site
name.
4.
The new site will appear in the upper-left list in the EnerVista SR3 Setup window.
5.
Click the Add Device button to define the new device.
6.
Enter the desired name in the "Device Name" field and a description (optional) of the
device.
7.
Select "USB Device" from the Interface drop-down list.
8.
Select the 350 relay as the USB device.
9.
Click the Read Order Code button to connect to the 350 device and upload the order
code.
CHAPTER 3: INTERFACES
350 FEEDER PROTECTION SYSTEM – INSTRUCTION MANUAL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents