About This Documentation; General Information; Scope; Validity Of The Documentation - Bosch Rexroth VAM 10.2 Project Planning Manual

Machine control panels
Table of Contents

Advertisement

DOK-SUPPL*-VAM*XX.2***-PR03-EN-P
Rexroth IndraControl VAM 10.2/40.2 Machine Control Panels
1

About this documentation

1.1

General information

1.2

Scope

1.3

Validity of the documentation

Overview on target groups and
product phases
Purpose
1.4

Documentation structure

Read this chapter thoroughly before using the application description.
This documentation applies to machine control panels VAM 10.2/VAM 40.2.
In the following illustration, the framed activities, product phases and target
groups refer to the present documentation.
Example: In the product phase "Mounting (assembly/installation)", the target
group "Mechanic/Electrician" can execute the activity "unpack, mount and in‐
stall" using this documentation.
Mounting
Product
Selection
(assembly/installation)
phases
Presales Aftersales
Design engineer
Mechanic/
electrician
Programmer
Technologist
Target
Process
groups
specialist
Select
Unpack
Prepare
Activities
Design
Construct
Fig. 1-1:
Assigning the present documentation to the target groups, product
phases and activities of the target group
This documentation describes the VAM 10.2 and VAM 40.2 machine control
panels.
The first part of the documentation contains important information on the in‐
tended use as well as information on the safety instructions
ing safety instructions" on page 7
on use" on page
9).
For a brief overview on the available machine control panel variants and their
differences, refer to
chapter 4 "System presentation" on page
For technical data, standards used and ambient conditions, refer to
5 "Technical data" on page
For dimensions and information on the machine control panel implementa‐
tion, refer to
chapter 6 "Dimensions" on page
For the device structure, refer to
Bosch Rexroth AG
Engineering
Commissioning
Programmer
Commissioning engineer
Technologist
Process specialist
Parameterize
Optimize
Mount
Program
Test
Install
Configure
Simulate
and
chapter 3 "Important Instructions
15.
23.
chapter 7 "Module design" on page
5/69
About this documentation
Operation
Decommissioning
Machine
operator
Maintenance
Mechanic/
technician
electrician
Service
Disposal company
Operate
Dismount
Maintain
Dispose
Remove
faults
Create
the NC program
(chapter 2 "Us‐
11.
chapter
29.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rexroth vam 40.2R911170770R911170772

Table of Contents