Lp Conversion Instructions - Lopi 564 GSR2 25K CF Installation Manual

Deluxe fireplace
Table of Contents

Advertisement

Finalizing the Installation

LP Conversion Instructions

WARNING
This conversion kit shall be installed by a qualified service agency in accordance with the manufacturer's
instructions and all applicable codes and requirements of the authority having jurisdiction. If the
information in these instructions is not followed exactly, a fire, explosion or production of carbon
monoxide may result causing property damage, personal injury or loss of life. The qualified service
agency is responsible for the proper installation of this kit. The installation is not proper and complete until
the operation of the converted appliance is checked as specified in the manufacturer's instructions
supplied with the kit.
Caution: The gas supply shall be shut off prior to disconnecting the electrical power, before
proceeding with the conversion.
Note:
Convert the appliance prior to installing the gas line to ensure proper gas use.
The GSR Stepper Motor Kit (4-pack = 94400999), (single = 250-01463) is required for converting
this appliance to LP. The kit contains the stepper motor (regulator) and torx wrench.
1
Remove the barrier and glass. Remove the logs and embers (if installed - page 41)
2
Remove the burners following the directions below.
Lift the rear burner, slide it to the right, and lift it from the firebox. The burner has a bracket that
inserts over two pins behind the burner. When replacing the burner make sure it is properly located.
Lift the front burner, slide it to the right, and lift it from the firebox. When replacing the burner make sure it is
properly located.
© Travis Industries
(for qualified installers only)
5/15/2019 - 1508
51
564 GSR2 25K CF (AUST)

Advertisement

Table of Contents
loading

Table of Contents