Palazzetti WT 78F V Installation And Maintenance Manual page 37

Table of Contents

Advertisement

3
HANDLING AND TRANSPORT
The fireplace is delivered with the metal structure
mounted, with the cladding separate, in a suitable
packaging for long transport. We recommend to unpack
the fireplace only when it has reached the place of
installation. The fireplace is delivered complete with all
the parts provided.
Make sure that children do not play with the components
of the package (e.g. films and polystyrene). Suffocation
hazard!
3.1
REMOVING THE PACKING
Remove the screws that secure the pins of the
fireplace to the pallet (Fig. 1) and remove the pallet.
Decommissioning and disposal of the materials can
be entrusted to a third party, provided to always use
companies authorised for recovery and elimination of
the materials in question.
Follow always and in any case the regulations in force
in the country where the fireplace is installed for the
disposal of materials and possibly for the disposal
report.
All disassembly operations for the demolition must
occur with the machine stopped.
3.2
TRANSPORT OF THE FIREPLACE
Make sure that the lifting carriage has a payload higher
than the weight of the appliance to be lifted. The full
responsibility of the lifting of loads lies on the person
handling the lifting equipment.
The Ecomonoblocco WT78 has on the right and left
sides some slots for the insertion of instruments for
lifting the fireplace.
Check that the payload of the cables is suitable for the
weight of the machine.
During lifting avoid jerking or abrupt movements.
Pay attention to overbalancing.
cod. 004777090 MBL - 19/12/2018 - Palazzetti - PN - Italy
Fig. 1
Fig. 2
37

Advertisement

Table of Contents
loading

Table of Contents