Project Management - Bartec SYSCOM ROCK User Manual

Table of Contents

Advertisement

Figure 11: Device assigned to a project with monitoring end date
Switching on a ROCK is always for a 30 days period minimum. It can be extended by clicking
o
in the date field and chose the new monitoring end date with the displayed calendar. It can
also be set to unlimited with the "∞" symbol. Setting to unlimited will required a manual turn off
of the device.
Once the monitoring is over, the ROCK can be "Return" to a local partner. It will be removed
o
from the "IDLE POOL".

3.3 Project management

This PROJECT page allows to create/add a project, export the whole project, archive or delete it.
Projects can also be accessed from here.
Once in a project, only relevant data for this specific project will be seen, especially:
The recorders list
o
"Set reporting" button, to configure the required information with the automated reporting
o
feature. Refer to below chapter.
"Set notification" button, to configure which notification (Email and/or SMS) should be sent to
o
whom.
SHARING field, where "Read / Write" or "View only" access can be given to some project
o
stakeholders. An "FTP Forward" server can be setup for data backup and automated
conversion into ASCII files.
Figure 12: SCS Project management
17 / 34
Copyright © Bartec Syscom 2019
www.bartec-syscom.com

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SYSCOM ROCK and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF