Download Print this page

Keysight X Series Installation Note page 5

Agile signal generators
Hide thumbs Also See for X Series:

Advertisement

Check Signal Generator Functionality
Use the following procedure to confirm that the signal generator powers up and the internal check
identifies no errors. The internal check evaluates the operation of the signal generator and returns
an error message if it detects a problem.
1. Turn on the signal generator and let it warm up for at least five minutes.
2. Run the signal generator self-test by pressing System > Instrument Info/Help Mode > Self
Test > Run Complete Self Test. Upon completion, a summary of the self-test will be
displayed. Use the N5191A/N5193A Service Guide to troubleshoot any failures detected by
the test.
3. Check to see if the ERR annunciator is on.
— If the ERR annunciator is on, review the error messages in the error queue by pressing
System > Error Info. The first page of error messages in the error queue appears in the
display text area. (Refer to the signal generator error messages document for information
about each error message.)
After resolving all problems causing errors, press Clear Error Queue(s).
— If the ERR annunciator is off, the signal generator functionality check has passed.
Installation Note N5191-90025
When the signal generator is first connected to ac line power, Reference Oven Cold
occurs which causes the OVEN COLD annunciator to turn on.
After approximately five minutes, the OVEN COLD annunciator automatically clears.
Some circuits may require up to 50 minutes to warm up before passing the
self-test. If self-tests continue to fail after 50 minutes of warm up, troubleshoot
the instrument.
Check Signal Generator Functionality
5

Advertisement

loading