Installation With Flanged Connections; After The Installation - GEM B26 Operating Instructions Manual

Manually operated compact flanged ball valve
Table of Contents

Advertisement

Available languages

Available languages

10.2 Installation with flanged connections

▶ Observe valid standards for mounting flanges!
3
4
2
1
1. Ensure sealing surfaces on the mating flanges are clean
and undamaged.
2. Only use connector elements made of approved materials.
3. Install the ball valve in the state it is delivered.
4. Carefully align the ball valve body 1 centrally between the
pipes with flanges 3.
5. Centre the seals 4 accurately. Seals are not included in the
scope of delivery.
6. Connect the ball valve flange 2 and piping flange 3 using
appropriate sealing material and matching bolting. Sealing
material and bolts are not included in the scope of deliv-
ery.
www.gemu-group.com
NOTICE
2
4
3
5
6
7. Insert bolts 5 in all holes in the flange.
8. Slightly tighten the bolts 5 and nuts 6 diagonally.
9. Check the alignment of the piping.
10. Tighten the nuts M diagonally.
Comply with appropriate regulations for the connections.

10.3 After the installation

● Re-attach or reactivate all safety and protective devices.
35 / 44
10 Installation in piping
GEMÜ B26

Advertisement

Chapters

Table of Contents
loading

Table of Contents