Lopi ProBuilder 36 CleanFace GSB2 Installation Manual page 51

Hide thumbs Also See for ProBuilder 36 CleanFace GSB2:
Table of Contents

Advertisement

LP Conversion Instructions
WARNING
This conversion kit shall be installed by a qualified service agency in accordance with the
manufacturer's instructions and all applicable codes and requirements of the authority
having jurisdiction. If the information in these instructions is not followed exactly, a fire,
explosion or production of carbon monoxide may result causing property damage, personal
injury or loss of life. The qualified service agency is responsible for the proper installation
of this kit. The installation is not proper and complete until the operation of the converted
appliance is checked as specified in the manufacturer's instructions supplied with the kit.
Caution: The gas supply shall be shut off prior to disconnecting the electrical power, before proceeding
with the conversion.
Note:
Convert the appliance prior to installing the gas line to ensure proper gas use.
The GSR Stepper Motor Kit (4-pack = 94400999, single = 250-01463) is required for converting this
appliance to LP. The kit contains the stepper motor (regulator) and torx wrench. The burner
orifices, pilot orifice, and burner gaskets are shipped with the appliance.
1
Remove the barrier and glass. Remove the logs and embers (if installed - page 44)
2
Remove the burners following the directions below.
Lift the rear burner and lift it from the firebox. The burner has a bracket that inserts over two pins behind the
burner. When replacing the burner make sure it is properly located.
Lift the front burner, slide it to the right, and lift it from the firebox. When replacing the burner make sure it is
properly located.
© Travis Industries
Installation
(for qualified installers only)
11/9/20 - 1503
51
PB36 CF Install (Aust)

Advertisement

Table of Contents
loading

Table of Contents