Chapter 2 Installation; Inspection; Check Line Voltage; Fig 2-1 Set Of Switch - Prodigit 3350F Series Operation Manual

High power electronic load
Table of Contents

Advertisement

12 PRODIGIT

Chapter 2 Installation

2-1. Inspection

The 3350F Series high power load was carefully inspected before shipment. If instrument
damage has occurred during transport, please inform Prodigit's sales and service office or
representative.
Your 3350F Series high power load was shipped with a power cord for the type of outlet used
at your location. If the appropriated cord was not included, please contact your nearest
Prodigit sales office to obtain the correct cord. Refer to "check line voltage "to check the line
voltage selection and fuse type.

2-2. Check line voltage

The 3350F Series high power load can operation with 115, 230Vac input as indicated on the
label on the rear panel.
Make sure that the factory check mark corresponds to your nominal line voltage. Skip this
procedure if the label is corrected marked.
2.2.1.
With the 3350F Series load power OFF, disconnect the power cord.
2.2.2.
Refer the drawing on the rear panel of 3350F Series high power load in Fig 2-1, set
The switches to the proper voltage as describe in the following:
Voltage selection switch

Fig 2-1 SET OF SWITCH

Voltage configuration

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3350f3351f3352f3353f3354f3356f

Table of Contents