Miele PG 8583 CD Operating Instructions Manual page 28

Laboratory glassware washer for laboratory glassware and utensils
Hide thumbs Also See for PG 8583 CD:
Table of Contents

Advertisement

Commissioning
Commissioning
completed
Fault 420
28
Commissioning is completed when the following message is dis-
played.
Confirm the message with OK.
The machine is now ready for use.
The settings made during the commissioning process are only
adopted after a complete program has been run.
Select any program, e.g.:
Press the Start/Stop button to start the program.
After commissioning, every program starts with reactivation of the
water softener.
If the program is canceled using
tions are deactivated.
Confirm the error message with OK.
Use the  button to switch the machine off.
Wait approximately 10 seconds before switching the machine on
again with the  button.
The commissioning procedure starts again.
Perform commissioning and activate at least one plumbing connec-
tion; e.g. for cold water.
Set up successful
Normal plus
Temperature
75 °C
Duration
1:30
Drain
.
Fault 420
h
, all the plumbing connec-

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

62858350usaPg 8583

Table of Contents