Agilent Technologies 7000 Series Operating Manual page 56

Hide thumbs Also See for 7000 Series:
Table of Contents

Advertisement

3
Installing Intuvo 9000 GC Column
To Replace an Intuvo GC Column
12 Verify that all Intuvo gaskets in the flow path are rated for the maximum
13 Place the column's click and run connectors into the single column (right)
14 Insert the column's attached Intuvo SmartID Key into the lower USB
15 Secure the new column by rotating the 1 c tab of the 4 column clamps over
16 Verify that the column's click and run fittings sit flat against the gasket.
17 Loosely install the two compression bolts.
Use the Intuvo torque driver to tighten the compression bolt until you hear one
C AU T I O N
click. Over-tightening can damage the flow path, strip the fittings, and cause
leaks.
18 Tighten the compression bolts until you hear a click from the Intuvo torque
19 Close the column door.
20 Install the bus door.
21 Close the GC front door.
56
column temperature expected with your method. Replace any gaskets that
have a lower temperature rating with one that has a temperature rating that
is compatible with your method.
bus fitting. See the GC manual for installing 2 columns in the GC.
connection shown.
the column retaining ring using the Intuvo torque driver.
driver.
7000/7010 Series TQ GC/MS Operating Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7010 series

Table of Contents