Precautions - Panasonic Elite Big PAC-i S-200PE3E5B Technical Data & Service Manual

Dc inverter
Hide thumbs Also See for Elite Big PAC-i S-200PE3E5B:
Table of Contents

Advertisement

2-2. Precautions

Request that the customer be present when the test run is performed.
At this time, explain the operation manual and have the customer perform the actual steps.
OUTDOOR UNIT MAIN PCB (CR)
Be sure to pass the manuals and warranty certificate to the customer.
Check that the 220 – 240 VAC power is not connected to the inter-unit control wiring connector terminal.
* If 220 – 240 VAC is accidentally applied, the indoor or outdoor unit control PCB fuse will blow in order to
protect the PCB.
Correct the wiring connections, then disconnect the 2P
connectors that are connected to the PCB, and replace
them with 2P connectors.
If operation is still not possible after changing the brown
connectors, try cutting the varistor.
(Be sure to turn the power OFF before performing
this work.)
INDOOR UNIT MAIN PCB (CR)
Check that the 220 –240 VAC power is not connected to
the inter-unit control wiring connector terminal.
* If 220 –240 VAC is accidentally applied, the indoor unit
control PCB fuse will blow in order to protect the PCB.
In this case, make the wiring correctly.
Then disconnect the 2P connectors (OC) that are
connected to the indoor unit PCB, and replace them
with 2P connectors (EMG).
If operation is still not possible after changing the brown
connectors, cut the jumper on the indoor unit PCB.
(Be sure to turn the power OFF before performing this
work.)
Outdoor main PCB
MODE pin
*MODE pin: factory setting is cooling operation
EMG (CN044, brown)
2-3
LED1
LED2
CHK pin
PUMPDOWN
RUN pin
mode.
Jumper
(JP040)
OC (CN040, blue)
Fig. 2-4
2
Fig. 2-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents