Installing Fixed Ramps; Installation Tower Check - Harmar Mobility HIGHLANDER II Installation & Service Manual

Vertical platform lift
Table of Contents

Advertisement

HIGHLANDER II: SECTION 4
INSTALLATION
Anchor
Anchor
8'
The first option is to use the optional tower brace
that attaches to the sides of the tower. Some
brackets attach to a structure. Then the brackets are
fastened together.
Locate the tower brace as high as possible on the
tower.
The second option for anchoring the lift is drilling
through the slots in the back of the tower cross-
braces at the desired locations and anchor to the
structure behind the lift. The wall needs a brace or a
solid structure behind it. Anchors should be built out
at least 1" from the center 15" of the tower back so
that top can be removed for service. Insert supplied
spacers behind tower cross braces when anchoring.

INSTALLING FIXED RAMPS

1. Position ramp 3/8" to 3/4" from the platform
opening.
2. Anchor the ramp to the concrete pad.
HIGHLANDER II VERTICAL PLATFORM LIFTS:
20
17FEB2021 | 630-00113 REV C
Anchor
Anchor
10'
12'
Figure 4-17
NOTICE
INSTALLATION TOWER
CHECK
Before reinstalling the top cap and front panels,
an operational check should be completed on the
internal tower safety features.
Apply temporary power and verify all four (4)
LED indicator lights on the control board are
solid green.
Manually depress the final limit switch (the
highest positioned switch) and verify any
travel of platform is prevented and indicator
14'
lights 1, 2, and 3 are flashing RED.
Manually depress the safety nut switch (the
switch near ACME nut) and verify any travel
of platform is prevented and indicator lights
1, 2, 3, and 4 are flashing RED.
Manually depress the Over-Speed Governor
(OSG) switch (the switch at the bottom
of ACME screw) and verify any travel of
platform is prevented and indicator lights 1,
2, and 3 are solid RED.
If equipped, lift the float of the float switch
(the switch at the bottom of the tower) and
verify that DOWN travel is prevented and
indicator light two (2) is flashing AMBER.
Verify that the ACME drive screw is
lubricated.
Verify that the shipping bolt was removed
from the cable tensioning pulley and that the
pulley is hanging in the tower without hitting
any obstacles during platform travel.
Verify that the manual lowering wrench and
socket are in place and secured on the top
plate with wing nuts.
Verify that the E-Stop is functional and
all 4-LED lights are solid red with no lift
movement.
Verify the screws securing the tower skins
have a plastic washer and are tight.
Install Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents