Installing The Fixed Ramp - Harmar Mobility HIGHLANDER EPL400 Installation And Owner's Manual

Enclosure with commercial platform lift
Table of Contents

Advertisement

11
Installing the Platform Guard Panels
Step 1
Insert the guard panel posts into the pockets
in the platform. The smooth side of the
guard panels should face in toward the
center of the platform. Bolt each post in
place with (2) 5/16-18 x 2" and (1) ¼-20 x 2"
hex head bolts.
If you have a 90° exit platform, install the end
guard panel using the provided bracket and
bolt to inner guard panel.
Step 2
Install the platform control box on the rear
guard panel using screws and nuts through
the panel.
Step 3
Plug in the harness for the platform control
box. Secure the harnesses under the clip on
top of the carriage flange.
Installing Fixed
Ramp
Step 1
• Position the ramp after the lift is in its final
location.
• Maintain a gap of 3/8" to 3/4" between the
ramp and platform.
• Drill a pilot hole into the concrete and
fasten using supplied concrete lags through
ramp flanges.

Advertisement

Table of Contents
loading

Table of Contents