Middle static pressure duct type
Hide thumbs Also See for EDM Series:

Advertisement

Available languages

Available languages

.
3. Using a 65-
the wall. Make sure that the hole is drilled at
a slight downward angle, so that the outdoor
end of the hole is lower than the indoor end
a out
.
water drainage (See Fig. 6.5). Place the
protective wall cuff in the hole. This protects
the edges of the hole and will help seal it once
you finish installation.
Outdoor
/ 0.5 inch
NOTE: When drilling the hole, make sure to
avoid wires, plumbing, and other sensitive
components.
4. Pass the drain hose through the wall hole.
Make sure the water drains to a safe location
where it will not cause water damage or a
slipping hazard.
NOTE: The drainpipe outlet should be at least
.
a ove the grou d. If it tou hes the
ground, the unit may become blocked and
malfunction. If you discharge the water directly
into a sewer, make sure that the drain has a U
or S pipe to catch odors that might otherwise
come back into the house.
Drainage test
Check whether the drainpipe is unhindered.
This test should be performed on newly built
houses before the ceiling is paved.
Units without a pump.
Stow tube
Fill the water pan with 2 liters of water.
Check that the drainpipe is unhindered.
V.1
ore drill, drill a hole i
. This ill e sure proper
Wall
Indoor
Fig. 6.5
Fig.6.6
Units with a pump.
1. Remove the test cover.
Fill the water pan with 2 liters of water.
Test cap
2. Turn on the unit in COOLING mode. You will
hear the drain pump. Check whether the
water is discharged properly (a 1-minute lag
is possible, depending on the length of the
drain pipe), Check whether water leaks from
the joints.
3. Turn off the air conditioner and put the
cap back on.
17
Fig.6.7
Stow tube
Fig.6.8