Alvarion BreezeACCESS VL System Manual page 77

Wireless broadband platform
Hide thumbs Also See for BreezeACCESS VL:
Table of Contents

Advertisement

Verify that the green Status LED located on the unit's front panel illuminates,
2
indicating that the power supply to the unit is OK and self test passed
successfully.
Connect the RF cable supplied with the antenna to the SMA jack located on
3
the unit's front panel. Install the antenna using the instructions provided in
Section
not over-tighten the SMA connectors.
If parameters are not pre-configured, configure the basic parameters as
4
described in Section 3.1.
Align the antenna as described in Section 3.3.
5
Connect the 10/100 Base-T Ethernet connector to the data equipment. The
6
cable connection should be a crossed Ethernet if connecting to a hub/switch
and a straight cable if connecting directly to a PC Network Interface Card
(NIC).
Verify proper operation of the Ethernet link (see Table 2-3 for the Ethernet
7
activity LED indication). To verify data connectivity from the end-user's PC or
from a portable PC connected to the unit, ping a known device in the network,
or try connecting to the Internet.
2.5.4.2
Wall Mounting the SU-I
The wall mounting kit for the SU-I includes a bracket, 2 screws, and 2 plastic
anchors. Refer to Figure 2-14.
If anchors are needed (wall-board, plaster board, etc.), drill two holes for the
1
anchors using a 6 mm drill bit and insert anchors. The distance between the
two holes should be 86 mm. Use the drilling template supplied with the SU-I.
Fasten the two screws provided with the kit directly to the anchors.
2
Use the two hangers on the rear to hang the mounting bracket on the two
3
screws. Make sure the bracket is stable.
Insert one side of the SU-I's base diagonally under the designated rail.
4
Gently apply pressure on the opposite side of the SU-I, until a clicking sound
5
is heard and the two bracket studs are locked onto the SU-I's base.
To dismount the SU-I, gently push the two bracket studs in the direction of
6
the wall and lift the CPE diagonally. Pull the CPE until free from the rail.
Installation
2.5.5
on page 52, and connect to it the other end of the RF cable. Do
Installing the SU-I
51

Advertisement

Table of Contents
loading

Table of Contents