Filling the Pump Unit

To fill the pumping unit, use exclusively the oils indicated in the table or equivalent. The
environmental conditions must be considered before purchasing oil. To transfer the oil from the
container to the tank use an external filler to prevent the introduction of foreign material or liquids at
the time of filling.

Pump Rotation

After making the electrical connections to the press it is necessary to make a visual check on the
direction of rotation of the electric motor.
Before checking the direction of the rotation of the pump, fill the reservoir with oil.
1. Unscrew the inspection cap.
2. Identify a reference point on the drive shaft.
3. Power up the motor for a maximum of 1-2 seconds.
4. Check that the rotation of the shaft in moving in the clockwise direction.
a. If the motor rotates in the wrong direction contact your electrician.
5. Screw down inspection cap.

Worktable Height Adjustment

To optimize use of the press it is necessary to set the worktable to a different height in relation to the
operation to be carried out on the press.
Before lifting the mobile table first check that:
• The eyebolts fixed to the worktable are fully tightened.
• The eyebolt support (nose piece) is properly screws onto the cylinder ram.
• The eyebolts fixed to the nose piece are fully tightened.
1. Hook chains to the respective eyebolts and lift the cylinder ram until the chains are set under
tension but, do not lift the table.
2. Check all chain connections to eyebolts to ensure a safe secure connection.
3. If secure, lift the table just above the desired table height.
4. Take the split pins off and then remove the table pins.
5. Insert the table pins to the desired work table height pin location then insert the split pins.
6. Slowly move the table down until it rests on the table pins.
7. Check to ensure the position and assembly of the pins are correct.
8. Unhook chains and leave them to hang in the downwards position.
Amount of oil for each press:
40 Ton
10.5 Gallons
70 Ton
10.5 Gallons
100 Ton
15.5 Gallons
11
Dake Corporation
1809 Industrial Park Dr
Grand Haven, MI 49417
www.dakecorp.com
REV122020

Advertisement

Table of Contents
loading

This manual is also suitable for:

Force 70Force 100

Table of Contents