Dake 25H Instructions And Parts List

Dake 25H Instructions And Parts List

Hand-operated hydraulic press
Hide thumbs Also See for 25H:

Advertisement

Quick Links

SETTING UP THE PRESS FOR OPERATION
For shipping convenience, the gauge, pump handle, hoist crank, screw nose and base angles were removed
from the press. Assemble these parts to the press in the following order:
1. Bolt the base angles to the uprights using the four bolts and nuts furnished. Shoulder the base angles
against the stops on the uprights.
2. Install the pressure gauge using a hydraulic sealant to ensure a sealed fit.
3. Insert pump handle into handle socket and fasten in place by means of the setscrew on top of the handle
socket.
4. CAUTION! Place the hoist crank on the lift drum shaft. The table is raised to the desired height by
turning the crank after removing the table pins. Check to make sure the hoist cable is tracking
correctly. Run the table channels from top to bottom. The cable should be on each of the two
upper pulleys and should track back and forth on the cable drum. Always place table pins under
the table channels before releasing the hoist crank when positioning the table channels for cable
tracking, servicing, or set-up for desired work opening. If a tracking problem exists, contact the
Dake factory for instructions. Be sure all table pins are fully inserted in place before applying
pressure. Always remove or release pressure on the cable before pressure is applied.
5. Fasten nosepiece to the end of the screw using the thumbscrew included.
OPERATIONS AND CONTROLS
The operator should acquaint himself with the use of the following controls:
A. Insert 4 table pins
B. Close release valve
C. Leave a gap of ½" between bumper and reservoir
D. Keep portion of screw extending beyond the ram as short as possible
1. The pump handle is the pressure supply source and is manually operated with an up and down motion.
2. Item number 41 (part no.10631) is the release valve handwheel. Always keep it firmly closed when
operating the press and it should only be opened when releasing the pressure to allow the ram to return.
3. By turning Item 33 (Part No. 716518), the ram screw can be adjusted in or out of the piston assembly.
Always keep the portion of the screw extending out of the piston as short as possible. It is advisable to
raise the table one or two sets of holes rather than running the screw out to its limit of travel.
EXCEED THE RECOMMENDED STROKE OF 5 INCHES FOR THIS PRESS. EXCEEDING THE
STROKE WILL CAUSE DAMAGE TO THE INNER PACKINGS.
4. The two combination table plates-v blocks provided are used for supporting the work piece.
5. Always pump piston down ½" before nose piece comes in contact with work. Damage to piston may
occur.
FILLING THE PRESS WITH OIL
It is extremely important that new, clean, light hydraulic oil be used in this press, Mobil DTE 24 or an
equivalent. It is strongly recommended that the oil be filtered to remove any possible dirt. The piston should
be in its maximum upper position when filling the reservoir. Fill the reservoir with 2 ½ quarts of oil. UNDER
NO CIRCUMSTANCES USE OLD DIRTY OIL. Next remove the screw plug from the top of the cylinder and fill
with oil. Close the release valve handwheel and pump oil into the workhead until oil is visible in the top of the
cylinder. This will remove all air from the chamber above the piston. Then install the gauge. If oil leaks by the
piston. The reservoir should be drained and refilled (2 ½ quarts of oil) with the piston in the top position.
25H Press
INSTRUCTIONS AND PARTS
LIST FOR MODEL 25H
HAND-OPERATED HYDRAULIC PRESS
1
NEVER
10/2015

Advertisement

Table of Contents
loading

Summary of Contents for Dake 25H

  • Page 1 If a tracking problem exists, contact the Dake factory for instructions. Be sure all table pins are fully inserted in place before applying pressure. Always remove or release pressure on the cable before pressure is applied.
  • Page 2: Safeguarding The Point Of Operation

    Safety Requirements for Construction, Care and Use It is important that Dake press users have a clear understanding of their responsibility involving the care and use of their Dake hydraulic press, including point-of-operation safe guards. Dake strongly recommends that Dake press users obtain a copy of the current American National Standard Institute (ANSI) B11.2 standard, for a...
  • Page 3: Warning Labels

    Do not make repairs or adjustments to any hydraulic system unless you are competent or working under competent supervision. If in doubt consult a qualified technician or engineer • Only use Dake original parts • Do not alter this press from the original design.
  • Page 4 GRAVITY – Hoist & table channel. Always place table pins under the table channels first then install remaining pins. Always release pressure on the cable before using press. TROUBLE SHOOTING – DAKE HAND HYDRAULIC PRESSES PUMP PACKING LEAKAGE If oil leaks past the pump packing, tighten the pump packing nut (551) until pump handle works hard, then slack off just enough to cause the handle to stay in position by itself.
  • Page 5: Handpump Assembly

    1129 Valve Rod Packing Nut Valve Rod Packing 3/8” Pipe Plug 3/8”-16 x 5/8” Set Screw 43589 Pump Gasket Hand Pump Assembly Complete 700887 Repair Kit – Cylinder & Hand Pump Assembly 701290 (Includes items – 5,8,17,20,21,23,30,31) 25H Press 10/2015...
  • Page 6 1/2” Street Elbow 1/8” Pipe Plug Oil Seal Piston Bumper Clamp Ring 982M Screw Adjusting Wheel 716518 Screw Screw Nose *Thumb screw if needed 43618 Reservoir Repair Kit – Cylinder & Hand Pump Assembly 701290 (Includes – Items 5,8,17,20,21,23,30,31) 25H Press 10/2015...
  • Page 7: Frame Assembly

    43645 Pulley nut 43912 9” Tube, ¼” Plastic 67761 Fitting, Tube, Poly-Tite 71413 Spacer Cable Cable Clamps Table Spacer Assembly one each of washer, 716691 bolt, spacer per part # Channel Washers 25H138P Wkhd mounting bolts 43348 25H Press 10/2015...
  • Page 8: Ordering Information

    Please order all parts by number and name. Also mention model number and serial number as shown on the plate attached to the frame of the press. Prices for parts do not include shipping charges. 724 Robbins Road Grand Haven, MI 49417 Phone: 616-842-7110 800-937-3253 Fax: 616-842-0859 800-846-3253 Web: www.dakecorp.com E-mail: customerservice@dakecorp.com technicalservice@dakecorp.com 25H Press 10/2015...

Table of Contents