Omron HD Safety Manual page 52

Mobile robot
Table of Contents

Advertisement

2.17 Charging Station
7. Next, confirm that the blue LED on the power supply box comes on.
Installation
You must follow the instructions provided in this document for safe and correct installation of
the charging station. Consider the following safety measures for power supply box installation:
The power supply box and the docking target must be properly secured to the wall or
l
floor prior to start-up. For instructions on how to install the power supply box and the
docking target refer to the HD-1500 Platform User's Manual (Cat. No. I645).
52
Figure 2-25. Main Disconnect Switch - ON Position
Figure 2-26. Power Supply Box Blue LED On
Mobile Robot HD Safety Manual
31500-100 RevA

Advertisement

Table of Contents
loading

Table of Contents