Server Unit /390
4.5.2 Activating IORSF
The set IORSF must be activated with an IMPL:
Requirement
You are in the AUXILIARY FRAME: IORSF CONTROL.
> Click on RETURN to switch back to the AUXILIARY FRAME: MENU.
> Enter
in the SELECTION=> field. Press the ENTER key.
4
The AUXILIARY FRAME: POWER STAND-BY/IMPL screen is displayed:
----- AUXILIARY FRAME: POWER STAND-BY/IMPL -----
RA
Figure 28: AUXILIARY FRAME: POWER STAND-BY/IMPL screen
> Enter
in the FUNCTION=> field to execute an IMPL. Press the ENTER key.
2
The following prompt appears on the screen:
***********************************
*
* ARE YOU SURE ? (ENTER Y OR N) N *
*
***********************************
!
CAUTION!
The IMPL must not be executed during system operation! If this instruction is not heeded, BS2000
will be aborted!
> Press the Y key to execute the IMPL or the N key to cancel the procedure. Confirm your entry with the
ENTER key.
FUNCTION=> 2
*1 POWER STAND-BY
*2 IMPL
CL-0
CPU-0 CHP-0
*
*
E90L01G
RUN
[]-[]00
61