Fast Forward EnergyCam Getting Started Tutorial page 24

Hide thumbs Also See for EnergyCam:
Table of Contents

Advertisement

Meter type:
(*) available with EnergyCam2
If the first digit of the meter display is partially covered, the value of the first digit can be configured in the UI.
If several digits of the meter display are partially covered, it is possible to define the number of digits that are
used from the meter (here 4), the number of digits that are added in front of these (3) plus the start value of
these (123).
FAST_EnergyCam_Manual.docx | v1.30 | 8. December 2016
Most meters work with an automatic detection. The following meters must be
configured:
page 24 / 38

Advertisement

Table of Contents
loading

This manual is also suitable for:

Energycam 2.0

Table of Contents