Installation
14
After you receive the analyzer, check all the items in the packing container.
Describes the system requirements needed to install the E5070A/E5071A and
how to secure space for heat radiation.
Shows how to mount the front handles used to transport the E5070A/E5071A
and how to install the flanges needed to install it in a rack.
Provides information for connecting the mouse, keyboard, BNC cable, and Ecal
module to the E5070A/E5071A.
Shows how to check the power supply as well as check and connect the power
cable. This section also describes what to do for a blown fuse.
Describes turning on/off of the Power switch and cutting off the power supply.
In this section you can also find how to set the internal clock.
Describes the daily maintenance for the E5070A/E5071A.
Chapter 2