Transportation/Setting-up
Fig. 5
No.
Component
1
Acknowledgement (deactivation) of
alarm signal
2
UPS ON/OFF
3
Power connection points for
instruments
When changing or reconnecting the UPS, proceed as follows:
1.
Connect all components with the UPS (instrument, PC, monitor, etc.)
2.
Connect the UPS with the power supply.
3.
Switch on the UPS.
4.
Switch on the components (instrument, PC, monitor, etc.).
The UPS is now installed.
— 18
No.
Component
4
PC communication port
5
Automatic circuit breaker, 6 A
6
UPS power supply connection point
SPECTROCUBE C — 28.08.2019
Need help?
Do you have a question about the SPECTROCUBE C XEP06C and is the answer not in the manual?
Questions and answers