Regency City ACB60ENG Owners & Installation Manual page 84

Direct vent
Table of Contents

Advertisement

ACB60/ACV60E CITY SERIES
installation
6. Place Log 1 on top of the log guide. The log guide will act as a guide
for the proper positioning of Log 1.
7. Install Log 2 to the left of Log 1. Make sure they are connected.
2
8. Install Log 3 to the right of Log 1. Rest the left side of Log 3 on the log
guide. Connect Log 1 and Log 3 to make the split between less visible.
9. Insert the pin of Log 4 into the hole on the left-most side of the burner.
The right end of Log 4 should sit 31 mm from the edge of the panel,
as shown below.
| City Series ACB60E
84
920-315
1
1
3
4
1 1/4 po
31 mm
10. Insert the pin of Log 5 into the hole on the left side of the pilot. Position
the left end of Log 5 35 mm from the edge of the panel.
11. Insert the pin of Log 6 into the hole on the right side of the pilot. Posi-
tion the left end of Log 6 3/4" from the edge of the panel.
12. Insert the pin of Log 7 into the hole on the right-most side of the
burner. Position the left end of Log 7 41 mm from edge of panel, as
shown below.
13. Install one box (1.6 kg) of 19 mm black coal (optional) around the
logs installed on the panels, as shown below.
Do not completely cover secondary air inlets-leave them 50% open.
Correct Black Coal placement
2
5
1 3/8 po
35 mm
6
19 mm
3/4 po
1 5/8 po
41 mm
7
12.23.20

Advertisement

Table of Contents
loading

Table of Contents