Benchmark 2.0LN Dual-Fuel Low NOx Boiler
CHAPTER 2: INSTALLATION
2.6 CONDENSATE DRAIN AND PIPING
The Benchmark 2.0LN Boiler is designed to condense water vapor from the flue products.
Therefore, the installation must have provisions for suitable condensate drainage or collection.
The condensate drain pipe located on the exhaust manifold (Figure 2-4) must be connected to a
condensate trap which is packed separately within the unit's shipping container.
The procedure to install and connect the condensate drain is provided in paragraph 2.6.1.
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288
Page 14 of 158
Operation and Maintenance Manual
Figure 2-3: Supply and Return Locations
GF-127
OMM-0052_0E
PR2: 04/22/13