GF-127
OMM-0052_0E

7.4 COMBUSTION CALIBRATION

The Combustion Calibration settings must be checked at the intervals shown in Table 7-1 as
part of the maintenance requirements.
instructions.

7.5 SAFETY DEVICE TESTING

Systematic and thorough tests of the operating and safety devices should be performed to
ensure that they are operating as designed. Certain code requirements, such as ASME CSD-1,
require that these tests be performed on a scheduled basis. Test schedules must conform to
local jurisdictions. The results of the tests should be recorded in a log book. See Chapter 6-
Safety Device Testing Procedures.

7.6 BURNER ASSEMBLY INSPECTION

The burner assembly (part no. 24176) is located at the top of the unit's heat exchanger. The
burner assembly may be hot. Therefore, allow the unit to cool sufficiently before removing the
burner assembly. It should be noted that the complete burner assembly also includes the blower
and air/fuel valve in addition to the Benchmark 2.0 Low NOx burner. The following parts will be
required for reassembly after burner inspection:
Part No.
81101
Burner Gaskets (2)
81048
Flame Detector Gasket
81068
Blower Gasket
To inspect or replace the burner assembly:
1. Set the ON/OFF switch on the control panel, to the OFF position. Disconnect AC power from
the unit and turn off the gas supply.
2. Remove the side and top panels from the unit.
3. Disconnect the lead wire from the flame detector installed on the burner plate. See Figure
7-5.
AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288
PR2: 04/22/13
Benchmark 2.0LN Dual-Fuel Low NOx Boiler
Operation and Maintenance Manual
Description
Refer to Chapter 4 for combustion calibration
CHAPTER 7: MAINTENANCE
Page 77 of 158

Advertisement

Table of Contents
loading

Table of Contents