Install Cable Covers; Projector Alignment; Issued: 12-26-07 Sheet #: 055-9494-1 - PEERLESS PARAMOUNT PPA Installation And Assembly Manual

Projector ceiling/wall mount
Table of Contents

Advertisement

Available languages

Available languages

Install Cable Covers

Cut cable covers (V) to the length of inner channel (C) and outer channel (B) openings, leaving space for cables if
10
routed through channels. Snap cable covers into openings as shown.
CEILING INSTALLATION
V
B
CUT TO
LENgTH OF
C
OPEnIng

Projector Alignment

If screws indicated in figure 11.1 are fully tightened,
11
loosen screws half a turn using allen wrench (N) to
allow for adjusting tilt, swivel and roll. Align projector
to the desired position and fully tighten screws.
WARNING
• Do not loosen adjustment screws to the point they
become disengaged from the mount. Weight of the
projector should be supported in case of accidental
disengagement.
20° (±10°) SWIVEL
SWIVEL ADJ USTM E NT
TOP VIEW
Visit the Peerless Web Site at www.peerlessmounts.com
WALL INSTALLATION
(ExCEPT FOR PPC MODELS)
V
CUT TO
LENgTH OF
OPEnIng
CABLES
SCREWS FOR ROLL
ADJUSTMENT
(FRONT AND BACk)
20° (±10°) ROLL
R O LL A D JU ST M EN T
FRONT VIEW
11 of 33
All other brand and product names are trademarks or registered trademarks of their respective owners.
CUT TO
V
LENgTH OF
OPEnIng
B
C
fig. 11.1
SCREWS FOR SWIVEL
ADJUSTMENT
35° (+30°/-5°) TILT
TILT A D J U ST M EN T

ISSUED: 12-26-07 SHEET #: 055-9494-1

For customer care call 1-800-865-2112 or 708-865-8870.
© 2008, Peerless Industries, Inc. All rights reserved.
V
CUT TO
LENgTH OF
OPEnIng
CABLES
SCREWS FOR TILT
ADJUSTMENT
(BOTH SIDES)
SIDE VIEW

Advertisement

Table of Contents
loading

Table of Contents