Berbel Skyline BDL 95 SK Operating And Installation Instructions page 77

Ceiling lift hood
Hide thumbs Also See for Skyline BDL 95 SK:
Table of Contents

Advertisement

Available languages

Available languages

Installation
For ceiling consoles with lowering capability and glass cover:
y The glass cover is placed loosely on the device.
y The glass cover must be guided into the console box of
the ceiling console.
☞ Ensure that the support cable and the mains cable are not
tensioned (e.g. by lifting the device with two people).
☞ Turn one corner of the glass cover diagonally upwards.
☞ Guide the glass plate fully into the ceiling console.
☞ Lower the glass plate from above onto the seal.
6002782_b – 14.09.2016
☞ Check that the mains cable and the electrical connection
cable are not kinked, crushed or damaged.
☞ Push the cover (placed loosely on the hood body) over
the support cable and the ceiling mounting plate.
☞ Screw in the lock nuts.
☞ Tighten the lock nuts to hand-tight.
☞ Switch the electricity supply on.
The device is ready for operation.
77

Advertisement

Table of Contents
loading

Table of Contents