Connecting The Terminals - ProMinent ProMaqua Bello Zon CDLb Series Operating Instructions Manual

Chlorine dioxide systems with external pre-storage vessel
Table of Contents

Advertisement

Installation

9.2.2 Connecting the terminals

30
11.
Fit the front part on the rear part.
WARNING!
Danger of an electric shock
If moisture penetrates into the control, an electric
shock may occur.
Once again check the seating of the seals to
ensure an IP 65 degree of protection rating is cor‐
rectly achieved.
Seal any unused broken out holes with blanking
plugs from the supplied supplementary kit.
12.
Check the seating of the seal once again.
13.
Manually tighten the housing screws until hand-tight.
1
2
3
4
Fig. 15: Fitting the threaded cable gland
1
Lock nut
2
Threaded cable gland
3
Multiple seal insert
4
Union nut
5
Blanking plug
To install the leads for terminals XK1 to X2 simply insert the
leads into the terminals. To release the leads for terminals
XK1 to X2 again, simply press on the white button of the
required terminal using the tip of a ball-point pen and pull the
lead out.
5
P_DC_0004_SW

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents