Pre-Storage Module - ProMinent ProMaqua Bello Zon CDLb Series Operating Instructions Manual

Chlorine dioxide systems with external pre-storage vessel
Table of Contents

Advertisement

Installation

9.1.4 Pre-storage module

24
Hydraulic and electrical connections for an external pre-storage module
25
24
23
22
Fig. 10: Plan view of the external pre-storage module
20
ClO
extraction
2
21a Level switch LLL
21b Level switch LL
21c Level switch HL
22
Level switch overflow OF
23
ClO
supply line
2
24
Connector pressure equalising line gas phase mixer vessel - simulta‐
neously acts as a pre-storage tank - exhaust gas 'lung' connection
tube
25
Exhaust gas 'lung', covered
1.
Fasten the pre-storage module to the floor using claw fasteners.
2.
Connect the connector for the ClO
ClO
solution solenoid valve.
2
3.
Connect the connector for the ClO
of the ClO
solution metering pumps.
2
4.
Set the height of the level switch (21) - see table
Height of level switch
for pre-storage
LLL
module for
cm
CDLb
6
10
12
10
22
10
55
10
120
10
21c
21b 21a
P_PMA_BEZ_0080_SW
solution supply line (23) to the
2
extraction to the suction line(s)
2
Ä on page 24 .
LL
HL
cm
cm
15
40
15
39
15
40
18
38
18
29
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents