Assembly - ProMinent ProMaqua Bello Zon CDLb Series Operating Instructions Manual

Chlorine dioxide systems with external pre-storage vessel
Table of Contents

Advertisement

Assembly

8
Assembly
Safety notes
Fitting the panel
18
WARNING!
Danger due to the sudden unexpected escaping of toxic
chlorine dioxide solution
The seals which are exposed to chlorine dioxide solution, will
start to leak if they are not replaced early enough.
The system must be set up so that it can be accessed
easily for maintenance.
The supplied mounting kit contains the necessary hangar
bolts, rawlplugs, washers and nuts (mounting kit = plastic
bags with fixings and threaded cable glands...).
Select the mounting height so that:
The LCD screen of the control can be easily read
n
The fluid level of the full chemical drums is below the metering pumps
n
The maximum priming lift of the metering pumps is not exceeded, see
n
table "Technical data" in the appendix
There is still sufficient space for the chemical drums below the
n
bracket.
Priming lift metering pumps, max.*
** With clean and moist valves, feed chemical water (20 °C), at 100 %
stroke length ("Pump" symbol), 180 strokes/min, opened bleed valve
(applies for CDLb metering pumps)
Secure the Bello Zon
tical wall, as close as possible to the point of injection.
Dimensions sheets - see appendix
1
Fig. 7: Fastening of deep drawn bracket
1
Rawlplug
2
Hanger bolt
3
Panel
4
Washer (plastic)
6
Hexagon nut
7
Protective cap
2 m water column
system on a suitable, smooth and ver‐
®
2
3
4
6
7
P_BEZ_0001_SW

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents