Wiring Diagram Cdlb - ProMinent ProMaqua Bello Zon CDLb Series Operating Instructions Manual

Chlorine dioxide systems with external pre-storage vessel
Table of Contents

Advertisement

Wiring diagram CDLb

23
Wiring diagram CDLb
Wiring diagram Bello Zon
®
external pre-storage vessel
INPUTS
Pre-storage module overflow
Pre-storage module
new batch
Acid vessel low
Acid vessel empty
Chlorite vessel low
Chlorite vessel empty
External fault
(gas detector)
Pre-storage module full
Mains connection 90-230 VAC
(dependent on version)
Pre-storage module empty
66
type CDLb with
CDLb 6 - 120 g/h with external storage module
Warning
OUTPUTS
Control acid metering pump
Control chlorite metering pump
Operation
max. 230 V
Alarm
Input level switch minimum
Limit stop chlorine dioxide
Metering pump or higher-level control
INTERNAL
Metering container acid full
Metering container chlorite full
Mixer vessel water pre-storage
Mixer vessel dilution
Mixer vessel overflow
Outlet valve acid
Outlet valve chlorite
Chlorine dioxide valve
Water valve
Metering pump, acid
Chlorite metering pump

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents