Carrying Out Commissioning - ProMinent ProMaqua Bello Zon CDLb Series Operating Instructions Manual

Chlorine dioxide systems with external pre-storage vessel
Table of Contents

Advertisement

Start up
11.5

Carrying out commissioning

Begin
start-up?
Expert code:
5000
40
Runtime and
Really reset runtime
ClO
reset
and ClO
2
Operation:
24 h
ClO2:
4 g
Produce
Pre-batch
pre-batch?
NaClO2 vessel
Start!
05:23 mm:ss
Pre-batch
HCl vessel
NaClO2 vessel
05:23 mm:ss
Empty
Emptying
vessels!
vessels?
Outlet v. open
- Confirm!
05:00 mm:ss
1st batch
Produce
1st batch?
NaClO2 vessel
05:23 mm:ss
Start!
Operation
Operation:
24 h
ClO2:
4 g
Explanation of the symbols in the menu items "1st Batch"
Symbol
Meaning
First row:
First row:
Second/third row:
HCl or NaClO
measuring vessel
full
HCl or NaClO
measuring vessel
not full
1.
Check whether a mixer vessel is connected to the outlet valve,
middle left on the mixer vessel.
2.
Lead the PVC tube into a canister of sufficient volume in which a
ClO
removal agent has been mixed, see the "Accessories" chapter.
2
3.
Change to the
[Change] key and press the [ENTER] key.
the
Runtime and
?
ClO
reset
2
2
Operation:
ClO2:
Pre-batch
HCl vessel
HCl vessel
NaClO2 vessel
Stop pump?
Empty
vessels?
Outlet v.closed
- Confirm!
HCl vessel
Pre-storage
vessel full
Pre-storage
vessel empty
Level warning
HCl or NaClO
drum
2
2
'Begin commissioning?' setting menu by pressing
0 h
0 g
B0499
Comment
Place filled
chemical drums
2
ready