Figure 43 - Solution Pump Overhaul / Refrigerant Pump Overhaul Screen - York YHAU-CW Manual

Double effect steam-fired absorption chiller
Table of Contents

Advertisement

FORM 155.31-ICOM2.EN.UL
SECTION 6 – OPERATION
ISSUE DATE: 12/21/2018
SOLUTION PUMP OVERHAUL / REFRIGERANT PUMP
OVERHAUL SCREEN
LD21554

FIGURE 43 - SOLUTION PUMP OVERHAUL / REFRIGERANT PUMP OVERHAUL SCREEN

The Solution Pump Overhaul section of the screen and
the Refrigerant Pump Overhaul section of the screen
both indicate the maintenance interval and the current
operation hours since the last maintenance.
When the required maintenance period has passed, the
maintenance alarm is activated with the warning, "So-
lution Pump should be overhauled" and/or "Refrigerant
Pump should be overhauled". When the maintenance
period has passed and the warning appears, contact
your local Johnson Controls Service Center.