York YHAU-CW Manual page 3

Double effect steam-fired absorption chiller
Table of Contents

Advertisement

FORM 155.31-ICOM2.EN.UL
ISSUE DATE: 12/21/2018
In complying with Johnson Controls' policy for contin-
uous product improvement, the information contained
in this document is subject to change without notice.
Johnson Controls makes no commitment to update or
provide current information automatically to the man-
ual or product owner. Updated manuals, if applicable,
can be obtained by contacting the nearest Johnson
Controls Service office.
It is the responsibility of rigging, lifting, and operating/
service personnel to verify the applicability of these
documents to the equipment. If there is any question
regarding the applicability of these documents, rig-
Absorption Chiller Long Term Storage
Long-Term Storage Checklist - Absorption Chiller
Long-Term Storage Requirements - General
Chiller-Heater Start-up and Commissioning Checklist
JOHNSON CONTROLS
CHANGEABILITY OF THIS DOCUMENT
ASSOCIATED LITERATURE
MANUAL DESCRIPTION
ging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of the
equipment prior to performing any work on the chiller.
CHANGE BARS
Revisions made to this document are indicated with a
line along the left or right hand column in the area the
revision was made. These revisions are to technical in-
formation and any other changes in spelling, grammar
or formatting are not included.
FORM NUMBER
50.20-NM11
50.20-CL10
50.20-NM10
155.31-CL1
3

Advertisement

Table of Contents
loading

Table of Contents