Opening Periods - Add New Values; Opening Periods - V Erify Or Delete Values - Tecnosicurezza TechMaster User Instructions

Hide thumbs Also See for TechMaster:
Table of Contents

Advertisement

TechMaster
Press
to delete all values entered.
Repeat the steps above for each closing period.
Closing periods (OFF days) – Verify or delete values
Enter Time Lock menu and press
Press
until the LCD shows:
Press
. LCD shows:
Press
. LCD shows:
Press
to check the first closing period scheduled.
Press
to scroll all the scheduled closing periods.
Press
to delete the scheduled closing periods.
Press
to confirm or
At the end of the list, press

Opening periods - Add new values

Opening periods are time intervals in which is possible to open the lock even when a time
lock is enabled.
It is possible to schedule up to 60 closing periods (they can be opening or closing periods).
Each one of them has a maximum time length of 14 days.
Enter Time Lock menu and press
Press
until the LCD shows:
Press
. LCD shows:
Press
. LCD shows:
The first one is an opening time while the second one is a closing time.
Enter a date and time for opening and closing, then press
confirm.
Should the year be set, the opening period is not repeated.
Should not the year be set (press
Press
to delete the values entered.
IU_TechMaster_04_eng
. LCD shows:
to exit.
.
. LCD shows:
), the opening period is yearly repeated instead.
User instructions
WEEKLY TIME LOCK
T1 SETTING
CLOSING PERIODS
SETTINGS
ADD NEW VALUES
VERIFY OR DELETE
VALUES
GG/MM/AA hh:mm
GG/MM/AA hh:mm
DELETE VALUES?
END OF LIST
EXIT?
WEEKLY TIME LOCK
T1 SETTING
OPENING PERIODS
SETTINGS
ADD NEW VALUES
GG/MM/AA hh:mm
GG/MM/AA hh:mm
to
15 of 27

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TechMaster and is the answer not in the manual?

Table of Contents