11 Installation drawings

11.1 Mounting surface preparation

To ensure correct operation, the mounting surface should be prepared as follows:
surface flatness requirement of 0.05 mm/m
surface should be free of paint and burrs
refer to installation drawing for required mounting hole positions.
To further simplify and help reduce installation time, it is recommended that the machine axis to which
the encoder is to be mounted is prepared with a datum edge or aligned dowel pins to help locate the
edge of the extrusion and ensure parallelism to the axis of motion.
> ML + 123
> 50
> 25

11.2 Location edge or dowel pins

R1 max.
X
//
0.1
Original instructions
Dimensions and tolerances in mm
M6 (M5*)
0.05
M6
> 90
*Permissible alternative screw size
Dimensions and tolerances in mm
//
0.1
X

11.3 Mounting orientations

B
Alignment pin
ISO 7092-6
(ISO 7090-5)
ISO 4762-M6
(ISO 4762-M5)
26 min
13
ISO 4762-M6
B
R1 max.
Machine edge mounting
0.1
X
//
D
85 ±0.1
//
0.1
X
ISO 4762-M5
Dimensions and tolerances in mm
B
ISO 4032-M6
ISO 4762-M6
D
37 ±0.2
0.1
//
KEY
D = Required mounting dimensions
8
X = Machine guideway/axis datum
NOTES
X
Side elevations show alternative
mounting orientations.
X
Screws sizes in brackets are
permissible alternatives.
D
2 ±0.1
B
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fortis-s fs

Table of Contents