Installation Of Hardware; Regarding U82; Installing W82 - ABB ESAB W82 Integration Manual

Robot for welding machine, interface w82 integrated and w82 anybus
Table of Contents

Advertisement

INSTALLATION OF HARDWARE

The installation chapter will describe how to connect the different components. The
ESAB integrated software in the robot controller should be installed by ABB before
delivery to the site.
Regarding U8
2
The U8
is not supported together with the W8
2
Pendant is used for communicating with the power source.
Installing W8
2
Connections and control devices
W8
Integrated
2
1. Indicating lamp
Orange indicating lamp - Overheating
2. Fieldbus
Connection for communication with robot system
3. Measure
Connection for measurement cable for arc voltage feedback and emergency
stop signal, measurement kit
4. Internal CAN
Connections for communication with ESAB wire feed unit and control panel
5. LAN
Connection to network, Ethernet
6. CAN to welding power source
Connection for communication with welding power source
7. USB
USB memory connection
cr09_02
integrated version. The ABB Teach
2
W8
Anybus
2
- 16 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Esab w82 anybus

Table of Contents