d. HYD 10-20KTL-3PH inverter shall be installed in a well-ventilated place.
e. No flammable or explosive materials close to HYD 10-20KTL-3PH inverter.
f. The AC overvoltage category of HYD 10-20KTL-3PH inverter is category III.
g. Maximum altitude: 2000m.

3.6. Determining the Installation Position

Determine an appropriate position for installing the HYD 10-20KTL-3PH
inverter. Comply with the following requirements when determining the
installation position.
Fig. 3-3 Installation Position of HYD 10-20KTL-3PH inverter
HYD 10-20KTL-3PH
- 14 -