Installation notes
Danger
Caution
Attention
3.1. Installation Process
Fig.3-1 Installation flowchart
3.2. Checking Before Installation
Checking Outer Packing Materials
Packing materials and components may be damaged during transportation.
Therefore, check the outer packing materials before installing the inverter. Check
the outer packing materials for damage, such as holes and cracks. If any damage
HYD 10-20KTL-3PH
Do NOT install the HYD 10-20KTL-3PH on flammable
material.
Do NOT install the HYD 10-20KTL-3PH in an area used to
store Flammable or explosive material.
The enclosure and heat sink are very hot while the inverter is
working, therefore do NOT install the HYD 10-20KTL-3PH in places
where you might touch them inadvertently.
Consider the weight of HYD 10-20KTL-3PH when transporting
and moving the inverters.
Choose an appropriate mounting position and surface.
Assign at least two persons to install the inverter.
Copyright © Shenzhen SOFARSOLAR Co., Ltd
3. Installation
- 9 -
User manual
Need help?
Do you have a question about the HYD 10K-20KTL-3PH and is the answer not in the manual?