Rev. A: January 2015
4. Site Preparation
Before proceeding with the unpacking and installation instructions in the following section(s),
make sure the work site is prepared and ready to use the Pro-X5. You should have an adequate
power source capable of providing clean Alternating Current (AC) power at 220-240 Volts at the
welder rated current. Refer to the welder serial plate affixed to the front side of the controller
housing for the voltage and current requirements of your welder. The install area should be clean,
dry and free of debris and provide adequate working area to allow efficient and effective use of
the welder.
Follow the detailed unpacking and installation instructions carefully.
5. Unpacking & Installation Instructions
This section contains instructions for the unpacking, placement and installation of the Pro-X5.
Carefully review the following information, sub-sections and each procedure before beginning
unpacking and installation of the welder.
The Pro-X5 comes complete in a sturdy, reusable, portable shipping/storage case. The custom
foam inserts protect the welder from damage during shipping and storage and should always be
left inside the case at all times. When the welder is out of the case, make sure to keep the lid closed
to avoid dirt, dust, debris and/or water from getting inside. The welder must be removed from the
case and placed onto the work site for use. When not in use, the Pro-X5 should always be stored
in the shipping/storage case to protect it from the elements and potential damage.
Note: The welder illustrated in this manual shows ALL available features for the
Pro-X5, therefore, your welder may vary slightly in appearance from that depicted.
Page 4
Pro-X5 Operator's Manual
600-Manual_Pro-X5 RA.docx