Agilent Technologies 280-DS Operator's Manual page 55

Mechanical qualification system
Table of Contents

Advertisement

4
Operating the 280-DS
2 Slowly lower the Vessel Module into the vessel until it is seated properly.
NOTE
NOTE
Figure 33.
280-DS Operator's Manual
For an EaseAlign vessel, ensure that you are lowering it down into
the vessel so it is oriented with the vessel diameter arm going into
the DDM cutout on the EaseAlign centering ring. Once lowered,
turn the Vessel Module so that the arm lever doesn't contact the
EaseAlign ring posts.
For 7025 and 7030 models, evaporation covers must be removed
prior to VM insertion.
For 708-DS, 709-DS, 7000 and 7010 models, it is necessary to
remove the sampling manifold and evaporation covers prior to VM
insertion.
Inserting the Vessel Module
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

G7980aa

Table of Contents