Burner Connection To The Boiler - baltur TBG 85 MC Instruction Manual For Installation, Use And Maintenance

Modulating two-stage gas burners
Table of Contents

Advertisement

Available languages

Available languages

ENGLISH

BURNER CONNECTION TO THE BOILER

HEAD UNIT ASSEMBLY
• Adjust the position of the coupling flange (19) by loosening the
screws (6) so that the burner head enters the furnace to the extent
recommended by the generator manufacturer.
• Position the insulating gasket (13) on the sleeve, by inserting the
cord (2) between the flange and the gasket.
• Fasten the head unit flange (14)to the boiler(19) by means of the
stud bolts, washers and nuts provided (7).
DANGER / ATTENTION
Seal the space between the burner sleeve and the hold on the
refractory material inside the boiler door completely with sui-
table material.
ASSEMBLING THE GAS TRAIN
The gas train can be assembled 8, 8a 9 9a in different ways.
TBG 85 ÷ 260 MC / 260LX MC
TBG 360 MC / LX MC
DANGER / ATTENTION
In case of very large valves, e.g. DN65 or DN80, make sure
there is a suitable support to prevent excessive stress on the
gas train fitting.
ASSEMBLY OF VENTILATION SYSTEM
Position the half-hinge on the burner scroll in line with those on the
combustion head assembly.
• Insert the hinge pin (10) in the position considered most suitable
• Connect the cables (switch on and ionisation) to the corresponding
electrodes, close the hinge, locking the burner by means of screws
(11).
• Insert the gas throttle control lever on the shaft and block it with
the specific nut.
(8) - (8a)
(9)
12 / 34
0006160008_201912
13
1
7
2
19
6

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents