Connecting The Line And Motor Cable At The Converter; Connection Overview - Siemens SINAMICS G120 PM240P-2 Installation Manual

Frequency converters
Table of Contents

Advertisement

4.2

Connecting the line and motor cable at the converter

4.2.1

Connection overview

Figure 4-2
Figure 4-3
Connect cables at the converter so that they are EMC compliant
Attach the cable tie holders to the Power
Module as shown to the left in the diagram
before you establish the connections.
Fix the line connecting cable using a cable tie
as shown in
Fix the shield of the motor connecting cable
using a hose clamp (
Connect the shield of the control cable with
the shield plate of the Control Unit (
a steel band. Also attach the control cable to
the Power Module using a cable tie (
Power Module PM240P-2
Hardware Installation Manual, 06/2020, A5E37800827C AD
Block diagram PM240P-2
Connection overview
.
).
4.2 Connecting the line and motor cable at the converter
) using
).
Connecting
41

Advertisement

Table of Contents
loading

Table of Contents